Previous Projects

BHP Ravensthorpe Nickel Project, Western Australia

Ertech Pty Ltd: $2,000,000

Welding and installation of 19km of 710mm HDPE seawater pipeline, including transport of pipe ,hydro-test and installation of fittings.

Harvey Water Project Harvey Western Australia
Harvey Pipe Project: $200,000

Installation of HDPE fittings and specialist work directly to the client.

Westonia Mine, WA. 2005
Westonia Mines: $450,000

Design, procure, install and commission 3km 355mm diameter pipeline and pump system to de-water approximately 1,400,000 m3 from an
existing flooded open cut mine including state of the art environmental protective telemetry.

BHP Minerva Gas Project, Victoria. 2004
BHP Biliton: $550,000

Weld and install 280mm diameter fire suppression system and 2 x 1450m long 450mm diameter directionally drilled out-falls including launching and retrieving the pipeline at sea and installation through drilled bore-hole.

Sydney Water , NSW, 2004
AJ Lucas: $6,500,000

Weld and install 2100 m of 710mm diameter pipe in a directionally drilled bore-hole under the town of Wollongong.

Department of Primary Industry, Victoria 2003
DPI: $1,400,000

The design and construction of 2 x 700m long 200mm diameter sea water intakes.

Pasminco, Tasmania, 2002
Pasminco Mines: $700,000

Construct and bury in seabed 200m long 800mm diameter acid waste line out-fall with additional 800mm intake supply lines.

South Australian Seafood, SA, 2001
SA Seafood: $1,600,000

Design and construction of 2 x 630m long 300mm diameter sea water intakes and pump systems for abalone farm installed on the seabed.

Misima Island, Papua New Guinea, 1999
Fusion Hire Services: $350,000

Weld and install 4km of 450mm , 710mm, 800mm and 1100mm Polyethylene pipeline.

Oceanwave, Geelong, Victoria, 1998
Oceanwave Seafood: $350,000

Full design, construct install and commission intake water system for abalone farm.
 

 


Polymer Welding Services
manufactured this purposebuilt
floating pump to remove
1,400,000 M3 of water from this
existing Westonia open cut
mine in 3 months.